PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

CMU layout at the 1st floor Bathroom 133-136 Facing West.jpg 2nd floor damper controllers Facing West.jpg Electrical roughing above the 2nd floor door frames Facing West.jpg Installed electrical split wire above the ceiling for the 2nd floor ENL Facing North.jpg Installed electrical split wire above the ceiling for the 2nd floor ENL Facing West.jpg Installed misc. duct work at the 1st floor Facing East.jpg Installing motorized damper controllers at the 2nd floor Facing South.jpg Started connecting copper piping to the 2nd floor  VAV Boxes Facing West (2).jpg Started connecting copper piping to the 2nd floor  VAV Boxes Facing West.jpg
Previous pageNext page Installed electrical split wire above the ceiling for the 2nd floor ENL Facing West
Installed electrical split wire above the ceiling for the 2nd floor ENL Facing West